City centre Bobigny (93)

Client
Cogedim

Architects
TVK, Lambert Lénack, Cobe, Barrault et Pressacco, Bartolo, Hardel Le Bihan

Progress/Delivery date
Construction ongoing

Surface area
100 000 m²

Construction cost
€120M excluding tax (value date 2017)

Scope of services

  • Structure
  • Fluids
  • Construction economics
  • Roadworks and various networks
Learn more

Programme

Dismantling of the Bobigny 2 shopping centre and reconstruction of a city centre district comprising:

  • 6 residential blocks (84000 m2),
  • 950 underground parking spaces,
  • A 10,000 m² office building,
  • 13,000 m² of premises for commercial and administrative use and a cinema comprising:
    - A cinema with 6 to 8 screens,
    - Shops at ground floor level,
    - A medium-sized food shop,
    - Administrative premises.

Technical characteristics

The construction work will be carried out in two phases.
Part of this work is being carried out in a semi-occupied environment, given the proximity of the Bobigny 2 shopping centre and the nearby metro station.

Environmental characteristics

High environmental quality certification for housing (NF HQE), BREEAM and NF HQE for offices, BREEAM for retail certifications.
Bioclimatic design.