City centre Bobigny (93)
Client
Cogedim
Architects
TVK, Lambert Lénack, Cobe, Barrault et Pressacco, Bartolo, Hardel Le Bihan
Progress/Delivery date
Construction ongoing
Surface area
100 000 m²
Construction cost
€120M excluding tax (value date 2017)
Scope of services
- Structure
- Fluids
- Construction economics
- Roadworks and various networks
Programme
Dismantling of the Bobigny 2 shopping centre and reconstruction of a city centre district comprising:
- 6 residential blocks (84000 m2),
- 950 underground parking spaces,
- A 10,000 m² office building,
- 13,000 m² of premises for commercial and administrative use and a cinema comprising:
- A cinema with 6 to 8 screens,
- Shops at ground floor level,
- A medium-sized food shop,
- Administrative premises.
Technical characteristics
The construction work will be carried out in two phases.
Part of this work is being carried out in a semi-occupied environment, given the proximity of the Bobigny 2 shopping centre and the nearby metro station.
Environmental characteristics
High environmental quality certification for housing (NF HQE), BREEAM and NF HQE for offices, BREEAM for retail certifications.
Bioclimatic design.