Clé de Saint Pierre development area (ZAC) housing project Saint-Pierre-du-Perray (91)
Client
I3F
Architect
Atelier BW
Progress/Delivery date
Construction ongoing
Surface area
2 300 m²
Construction cost
€3,4M excluding tax (value date 2019)
Scope of services
- Structure
- Electricity
- Fluids
- Thermal
- Construction economics
- Roadworks and various networks
Programme
Construction of a 35-unit block of flats and basement car park.
Technical characteristics
Reinforced concrete walls and floors for the residential units.
Reinforced concrete post-and-beam framework for the car park.
Heat is produced by a shared gas-fired heating system in the basement.
Environmental characteristics
RT 2012 -20%.
High environmental quality (NF HQE) for housing, “entry-level” profile certification.
BiodiverCity label.
Level E2C1.