Housing project Antony (92)

Client
Cogedim

Architect
CoBe

Progress/Delivery date
Preliminary studies ongoing

Surface area
Building 1A: 490 m² / Building 1B: 450 m² / Building 2: 1 170 m²

Construction cost
NA

Scope of services

  • Structure
  • Electricity
  • Fluids
  • Roadworks and various networks
Learn more

Programme

Construction of 3 buildings for sport activities.

Technical characteristics

Reinforced concrete structure for the ground floor and timber structure for the first floor with MOB, FOB and timber flooring.
Deep pile foundations.
Single and dual flow ventilation.
Heat pumps.

Environmental characteristics

RE2020 for the housing/office section.
RT 2012 level E3C1 for the changing rooms and clubhouse buildings.
120 m² of photovoltaic panels.