Housing project Antony (92)
Client
Cogedim
Architect
CoBe
Progress/Delivery date
Preliminary studies ongoing
Surface area
Building 1A: 490 m² / Building 1B: 450 m² / Building 2: 1 170 m²
Construction cost
NA
Scope of services
- Structure
- Electricity
- Fluids
- Roadworks and various networks
Programme
Construction of 3 buildings for sport activities.
Technical characteristics
Reinforced concrete structure for the ground floor and timber structure for the first floor with MOB, FOB and timber flooring.
Deep pile foundations.
Single and dual flow ventilation.
Heat pumps.
Environmental characteristics
RE2020 for the housing/office section.
RT 2012 level E3C1 for the changing rooms and clubhouse buildings.
120 m² of photovoltaic panels.