Romain Gary school complex gymnasium Thiais (94)
Client
City of Thiais
Architect
Jean-Pierre LOTT
Construction company
Hervé
Progress/Delivery date
2012
Surface area
6 942 m²
Construction cost
€12M excluding tax (value date 2009)
Scope of services
- Structure
- Electricity
- Fluids
- Roadworks and various networks
- Catering design
- Construction economics
- Scheduling, steering and coordination
Programme
Construction of 600-pupil school complex divided into 23 classrooms, 450-meal canteen (single sitting) and 200-spectator, 24x44m gymnasium with stands.
Technical characteristics
Electricity generated from waterproofing membrane incorporating 200m² photovoltaic cells.
Concrete frame structure.
Environmental characteristics
Sustainable development (HQE) approach.
Bioclimatic design.