Jean-Baptiste Corot middle school gymnasium Le Raincy (93)
Client
Seine-Saint-Denis department council
Architect
Marc Farcy
Construction company
Eiffage
Progress/Delivery date
2015
Surface area
600 m²
Construction cost
€12M excluding tax (value date 2013)
Scope of services
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Construction of 700-pupil secondary school including:
- A general education centre,
- An open plan secondary centre,
- A 500-meal/day canteen,
- A staff accommodation,
- Agymnasium,
- 600m², 63-space basement car park.
Technical characteristics
Space heating and hot water production provided by mixed system of vertical geothermal probes and gas fuelled boiler.
Geothermal plant sized to provide approximately 80% of annual heating requirement.
Environmental characteristics
Thermal performance regulation RT2012 compliance.