Henri Vidal sports complex Montfermeil (93)
Client
City of Montfermeil
Architect
A5A Architects
Construction company
Saint Denis Construction
Progress/Delivery date
2019
Surface area
3 100 m²
Construction cost
€7M excluding tax (value date 2016)
Scope of services
- Structure
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Reconstruction of Henri Vidal sports centre comprising gymnasium (multi-sport hall, national climbing wall, 475-seat grandstand, martial arts (dojo), multipurpose hall), changing room in 300-seat grandstand.
Technical characteristics
Anchored piles.
Reinforced concrete walls, columns, beams and slabs.
Steel truss spans in multisport and climbing halls.
Grandstand, steel sheet roof on existing steel structure, some elements replaced and anti-corrosion treatment.
Space heating and domestic hot water supplied by ground floor gas boiler room equipped with cogeneration and three condensing boilers.
Changing rooms heated by hot water radiators and radiators in offices, corridors, lobby and reception area.
Radiant hot water panels installed in sports halls.
Premises except sanitary, stores, circulation; double flow ventilation.
Environmental characteristics
Thermal performance 2012 Effinergie +.