Main rescue centre Joué-les-Tours (37)
Client
SDIS of Indre-et-Loire
Architect
KOZ
Progress/Delivery date
2001
Surface area
3 800 m²
Construction cost
€2,39M excluding tax (value date 1998)
Scope of services
- Structure
- Electricity
- Fluids
- Construction economics
Programme
3-storey building, gas fuelled central space heating system, single and dual duct ventilation system.
Technical plant backup by emergency power generator.
Technical characteristics
Reinforced concrete construction.
Gas fuelled boiler hot water production and space heating radiators.
Staff changing room ventilated by air handling unit to provide fresh preheated air.
Cooling of telecommunications and waste storage rooms provided by individual air conditioners.
Card reaer access control system installed as well as badge-operated pumped fuel system.