Mireille Darc school complex Limeil-Brévannes (94)

Client
City of Limeil-Brévannes

Architect
A5A Architects

Construction company
OBM

Progress/Delivery date
2020

Surface area
3 800 m²

Construction cost
6,5M € excluding tax (value date 2017)

Scope of services

  • Structure
  • Construction economics
  • Electricity
  • Fluids
  • High Environmental Quality
  • Roadworks and various networks
Learn more

Programme

Construction of:

  • A 12-classroom school comprising a canteen,
  • A multi-purpose room,
  • A library,
  • A physical education hall for 300 pupils (6 kindergarten and 6 elementary classrooms). 

Technical characteristics

Timber construction: load-bearing structure includes cross laminated timber floors.
Elevation of modular timber panel cladding system.
Classrooms decentralized dual flow ventilation.

Environmental characteristics

Thermal performance objectives set in compliance with the themal performance regulations RT2012 (-10%).
Roof terraces designed as playgrounds, planted on edges, sealed with adequate waterproofing material.
Stretched canvas partially cover 4th storey, last floor level.
High Environmental Quality certification.
Eco-friendly green site construction.
Bioclimatic design rapport.