Community centre Saint-Cyr-l'École (78)
Client
City of Saint-Cyr-l'École
Architect
Jean-Pierre LOTT
Construction company
Structural work: Batiouest
Progress/Delivery date
2023
Surface area
3 990 m²
Construction cost
€5M excluding tax (value date 2018)
Scope of services
- Structure
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
- Scheduling, steering and coordination
Programme
Construction of Community Centre comprising reception hall, multi-purpose hall for 300 people, music studios, business and community premises, car park on ZAC du Renard, Saint-Cyr-l'Ecole.
Technical characteristics
Deep cast reinforced concrete piles dimensioned to bear vertical and horizontal loads.
Reinforced concrete structure with fair face finish in elevation.
Space heating supplied by gas boiler located on roof terrace.
Two condensing boilers in sequence to limit power use, as required.
Double flow ventilation, heat recovery on extracted air (multipurpose halls, reception hall).
Environmental characteristics
Thermal performance 2012.