Community centre Saint-Cyr-l'École (78)

Client
City of Saint-Cyr-l'École

Architect
Jean-Pierre LOTT

Construction company
Structural work: Batiouest

Progress/Delivery date
2023

Surface area
3 990 m²

Construction cost
€5M excluding tax (value date 2018)

Scope of services

  • Structure
  • Construction economics
  • Electricity
  • Fluids
  • High Environmental Quality
  • Roadworks and various networks
  • Scheduling, steering and coordination
Learn more

Programme

Construction of Community Centre comprising reception hall, multi-purpose hall for 300 people, music studios, business and community premises, car park on ZAC du Renard, Saint-Cyr-l'Ecole.

Technical characteristics

Deep cast reinforced concrete piles dimensioned to bear vertical and horizontal loads.
Reinforced concrete structure with fair face finish in elevation.
Space heating supplied by gas boiler located on roof terrace.
Two condensing boilers in sequence to limit power use, as required.
Double flow ventilation, heat recovery on extracted air (multipurpose halls, reception hall).

Environmental characteristics

Thermal performance 2012.