Miriam Makéba School complex Nanterre (92)

Client
City of Nanterre

Architect
TOA

Delivery date
2019

Surface area
4 050 m²

Construction cost
€9,95M excluding tax (value date 2016)

Scope of services

  • Structure
  • Construction economics
  • Electricity
  • Fluids
  • High Environmental Quality
  • Roadworks and various networks
  • Fire safety systems
  • Catering design
Learn more

description

Construction of a school complex including:

  • 7 elementary school,
  • 5 nursery school classrooms,
  • A recreation centre,
  • A 21-space basement car park.

Technical characteristics

Located in Buffon sector within urban and social regeneration project of university neighbourhood, school complex construction complies with sustainable development program.

Approach based on use of eco-friendly materials (adobe walls, stainless steel cladding, vegetated roofs, linoleum flooring finishes, etc.) and eco-management calculations (space heating and hot water production supplied by wood fuelled boiler to floor space heating system).

Wood fuelled boiler.

Environmental characteristics

Thermal performance level BEPOS.

Credits photos: © Frédéric Delangle