Robert Doisneau secondary school Clichy-sous-Bois (93)
Client
Seine-Saint-Denis department
Client assisted by
SODEDAT 93
Architect
Jean-Pierre LOTT
Construction company
Léon Grosse
Progress/Delivery date
2003
Surface area
7 193 m²
Construction cost
€9,8M excluding tax (value date 2000)
Scope of services
- Structure
- Electricity
- Fluids
- Roadworks and various networks
- Construction economics
- Catering design
Programme
Construction of a 600 students middle school including a gymnasium, a canteen and staff accomodation units.
Technical characteristics
Conservation and rehabilitation of the existing building. Demolition of other buildings on the site.
Work carried out on an occupied site with temporary buildings.
Concrete structure; curved sails for the CDI part covered by an exterior resin ensuring waterproofing.
Thermal insulation from the inside.
Double flow ventilation for permanent and half-board.