International secondary school Noisy-le-Grand (93)

Client
Seine-Saint-Denis department

Architect
SCAU

Construction company
Eiffage

Progress/Delivery date
2015

Surface area
9 852 m²

Construction cost
€22M excluding tax (value date 2013)

Scope of services

  • Construction economics
  • Electricity
  • Fluids
  • High Environmental Quality
  • Roadworks and various networks
Learn more

Programme

Construction of 400-pupil international middle school including:

  • A general education centre,
  • An open plan secondary school,
  • 400-meal/day canteen,
  • A corporate housing,
  • A multipurpose sports surface,
  • A 140-room internship.

Technical characteristics

Space heating and hot water production supplied by mixed system of vertical geothermal probes and gas fuelled boiler.
Geothermal energy sized to provide 80% of annual heating requirement.

Environmental characteristics

Thermal performance level is passive (Cep < 0 kWh/m²/a).
Onsite heating production provided by 1200m² mono-crystalline photovoltaic solar panels equivalent to nominal 200 kW capacity.