International secondary school Noisy-le-Grand (93)
Client
Seine-Saint-Denis department
Architect
SCAU
Construction company
Eiffage
Progress/Delivery date
2015
Surface area
9 852 m²
Construction cost
€22M excluding tax (value date 2013)
Scope of services
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Construction of 400-pupil international middle school including:
- A general education centre,
- An open plan secondary school,
- 400-meal/day canteen,
- A corporate housing,
- A multipurpose sports surface,
- A 140-room internship.
Technical characteristics
Space heating and hot water production supplied by mixed system of vertical geothermal probes and gas fuelled boiler.
Geothermal energy sized to provide 80% of annual heating requirement.
Environmental characteristics
Thermal performance level is passive (Cep < 0 kWh/m²/a).
Onsite heating production provided by 1200m² mono-crystalline photovoltaic solar panels equivalent to nominal 200 kW capacity.