Housing units - Marjolin street Levallois-Perret (92)
Client
iOPDH 92
Architect
Archi-tecture
Construction company
Eiffage construction
Progress/Delivery date
2015
Surface area
5 900 m²
Construction cost
€11M excluding tax (value date 2012)
Scope of services
- Structure
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Construction of 75 housing units at 15-17 and 13 units at 58 Marjolin street.
Technical characteristics
Reinforced concrete construction with thermal bridge breakers and internal insulation.
Construction of perimeter wall for 2-level underground car park on with temporary walls.
Environmental characteristics
Thermal performance regulation RT2012 (-10%).
Installation of waste water heat recovery system to preheat hot water production.
H&E profile A Cerqual certification.