Housing units Montreuil-sous-Bois (93)
Client
Cité consultant
Architect
Muriel Germak
Construction company
Demathieu Bard
Progress/Delivery date
2017
Surface area
4 166 m²
Construction cost
€6,6M excluding tax (value date 2014)
Scope of services
- Structure
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Construction of 68 flats subdivided into 22 social housing units and 46 owner-occupied units.
Project also provides 23 car spaces on basement level.
Technical characteristics
Strip footings.
Post/beam reinforced concrete structure.
Space heating and domestic hot water supplied by central gas boiler located in basement.
Environmental characteristics
Habitat & Environement (H&E) profile A certification.
Thermal reglementation RT 2012 (-10%) certification.