Collective housing Morsang-sur-Orge (91)

Client
Immobilière 3F

Architect
Vong DC

Construction company
TBI

Progress/Delivery date
2018

Surface area
1 950 m²

Construction cost
€4,8M excluding tax (value date 2016)

Scope of services

  • Structure
  • Construction economics
  • Electricity
  • Fluids
  • High Environmental Quality
  • Roadworks and various networks
Learn more

Programme

Construction of a 43-housing unit estate (33 rental and 10 owner-occupied units) as well as a public access road, transferred on completion.

Technical characteristics

Slab on reinforced ground foundation.
Reinforced concrete structure and terracotta brick elevation walls.
Domestic hot water and space heating supplied by gas condensing boilers.
Domestic hot water for individual houses supplied by mechanically ventilated thermodynamic water heater.
Flats; humidity-sensitive mechanical ventilation with heat recovery on extracted air to preheat domestic hot water service.

Environmental characteristics

H&E profile A Cerqual certification.
Thermal reglementation RT2012 (-10%) certification.