Collective housing Morsang-sur-Orge (91)
Client
Immobilière 3F
Architect
Vong DC
Construction company
TBI
Progress/Delivery date
2018
Surface area
1 950 m²
Construction cost
€4,8M excluding tax (value date 2016)
Scope of services
- Structure
- Construction economics
- Electricity
- Fluids
- High Environmental Quality
- Roadworks and various networks
Programme
Construction of a 43-housing unit estate (33 rental and 10 owner-occupied units) as well as a public access road, transferred on completion.
Technical characteristics
Slab on reinforced ground foundation.
Reinforced concrete structure and terracotta brick elevation walls.
Domestic hot water and space heating supplied by gas condensing boilers.
Domestic hot water for individual houses supplied by mechanically ventilated thermodynamic water heater.
Flats; humidity-sensitive mechanical ventilation with heat recovery on extracted air to preheat domestic hot water service.
Environmental characteristics
H&E profile A Cerqual certification.
Thermal reglementation RT2012 (-10%) certification.