It's a win!
26/01/2023
Requalification and extension of the pool of Sevran (93).
INCET, in partnership with the COLAS, BVL Architecture and Patrick TUAL, has been awarded the design-build contract for the requalification and extension of the Sevran pool as part of the Héritage JOP 2024 project.
This project aims to contribute to the sustainable legacy of the Paris 2024 Olympic and Paralympic Games and, above all, to promote universal access to water by making swimming a vector for education, health, and integration.
INCET is proud to handle the structural, construction economics, electrical, road and drainage works, and environmental aspects for this ambitious project.