Swimming pool Sevran (93)

Client
City of Sevran

Architect
BVL Architecture

Construction company
COLAS

Progress/Delivery date
Études en cours

Surface area
4 359 m²

Construction cost
€17,5M excluding tax (value date 2022)

Scope of services

  • Structure
  • Construction economics
  • Prescripteur
  • Electricity
  • Roadworks and various networks
  • Environment
Learn more

Programme

Upgrading and extension of the Sevran swimming pool as part of the HERITAGE JOP 2024 project.

Technical characteristics

The current structure consists of reinforced concrete walls, columns, beams, slabs and staircases.
The roof is divided into several sections:

  • Timber frame and steel decking for the first floor,
  • Steel framework for the pool area,
  • Timber frame, steel decking and green roofs on ground floor.

Incorporation of 30% CEMIII low-carbon concrete.
Energy production via connection to the district heating network.

Environmental characteristics

NF norms for sports facilities - high environmental quality (HQE) strategy for swimming pools.
Level 1 of the organically-sourced label.