Marville Olympic Aquatic Centre Saint-Denis / La Courneuve (93)
Client
Department of Seine-Saint-Denis
Architect
BVL Architecture
ASB Architectures
Construction company
GCC
Progress/Delivery date
Construction ongoing
Surface area
4 884 m²
Construction cost
€26,65M excluding tax (value date 2020)
Scope of services
- Structure
- Electricity
- Thermal
- Construction economics
- Prescripteur
- High Environmental Quality
- Roadworks and various networks
- CommiFire safety systemsonnement
Programme
Construction of an aquatic centre at the Parc Départemental des Sports de Marville, straddling Saint-Denis and La Courneuve.
It will serve as the main training centre for water polo athletes during the 2024 Olympics, then given as a legacy project to the people of Seine-Saint-Denis.
The interior will include:
- 3 pools (sports, leisure and education),
- A play lagoon,
- A "well-being" area.
The exterior, bordered by a beach, will include:
- A Nordic sports pool,
- A summer fun pool,
- A solarium.
Technical characteristics
Carbon budget under control.
Integration of organically-sourced materials.
Energy recovery from the pool water.
100% open-air stormwater management.
Environmental characteristics
NF HQE (high environmental quality certification) for sports facilities - HQE strategy for swimming pools.
Biodivercity certification.