Police station Rueil-Malmaison (92)

Client
Hauts-de-Seine department council

Client assisted by
KOZ

Architect
Valero & Gadan

Construction company
Vinci

Progress/Delivery date
2007

Surface area
2 000 m²

Construction cost
€3,62M excluding tax (value date 2004)

Scope of services

  • Structure
  • Electricity 
  • Fluids
  • Construction economics
Learn more

Programme

Site of former gendarmerie, construction of police station including:

  • A single-storey public and staff car park structure,
  • A public lobby,
  • A custody room,
  • A commanding officer post,
  • A changing room,
  • Sanitary blocks,
  • A communications room,
  • An armoury,
  • Offices.

Technical characteristics

Cast in situ reinforced concrete frame construction.
Underground reinforced concrete storm water tank and gas fuelled boiler space heating system.
Temperature control system configured locally or remotely via Ethernet network or Internet.
Installation of BMS to control technical plant.
Closed-circuit television system, access control and intrusion alarm.