Police station Rueil-Malmaison (92)
Client
Hauts-de-Seine department council
Client assisted by
KOZ
Architect
Valero & Gadan
Construction company
Vinci
Progress/Delivery date
2007
Surface area
2 000 m²
Construction cost
€3,62M excluding tax (value date 2004)
Scope of services
- Structure
- Electricity
- Fluids
- Construction economics
Programme
Site of former gendarmerie, construction of police station including:
- A single-storey public and staff car park structure,
- A public lobby,
- A custody room,
- A commanding officer post,
- A changing room,
- Sanitary blocks,
- A communications room,
- An armoury,
- Offices.
Technical characteristics
Cast in situ reinforced concrete frame construction.
Underground reinforced concrete storm water tank and gas fuelled boiler space heating system.
Temperature control system configured locally or remotely via Ethernet network or Internet.
Installation of BMS to control technical plant.
Closed-circuit television system, access control and intrusion alarm.