Police station Avion (62)

Client
Seine Departmental Fire and Rescue Service

Architect
KOZ

Progress/Delivery date
2010

Surface area
4 680 m²

Construction cost
€3,14M excluding tax (value date 2002)

Scope of services

  • Structure
  • Fluids
  • Electricity
  • Construction economics
  • Roadworks and various networks
Learn more

Programme

Construction of police station including:

  • Staff changing rooms,
  • Investigation offices,
  • Custody cells,
  • A communications room,
  • A radio room,
  • A boiler room,
  • A standby power generator,
  • A public and staff car park.

Technical characteristics

Reinforced concrete construction with briquette facing in elevation.
Space heating by gas fuelled boiler and radiators.
Air handling ventilation system equiped with hot and cold battery to supply fresh air at ambient temperatures in winter and cooling during summer.