School campus Sartrouville (78)
Client
Yvelines Department
Client assited by
Altarea
Architect
Gianni Ranaulo Officina
EntrepriseS généraleS
GCC
Léon Grossei
Progress/Delivery date
Preliminary studies ongoing
Surface area
4 404 m²
Construction cost
€48M excluding tax (value date 2022)
Scope of services
- Structure
- Electricity
- Fluids
- Roadworks and various networks
Programme
Overall performance contract for the design, construction, operation and maintenance of a school complex comprising:
- A nursery school,
- A primary school,
- A day-care centre not including accommodation (ASLH),
- A secondary school,
- Day-boarding facilities,
- A gymnasium,
- Staff accommodation.
Technical characteristics
The structure is made of reinforced concrete, with wooden concrete facades.
Double flow ventilation.
Wood-fired heating system for the entire project, except for the day boarding section, which has a gas-fired heating system.
Environmental characteristics
RE2020 with an E3C1 performance level.
Level 3 organically-sourced building label for tertiary buildings.
High environmental quality (HQE) strategy.