FLI Orsay (91)
Client
Paris Sud University
Architect
Brenac & Gonzalez
Construction companies
CES / Structural work: Vinci
Progress/Delivery date
2018
Surface area
7 015 m²
Construction cost
€16,3M excluding tax
Scope of services
- Structure
- Roadworks and various networks
- Electricity
- Fluids
- Équipements laboratoires
- Construction economics
- High Environmental Quality
- Operations and maintenance
Programme
Construction of a building including the entities of Automatic, Fluid laboratory and Thermal Systems (FAST), Theoretical physics lab and Statistical Models (LPTMS), the Institute of Physical appearance Moved forward (IPA) and offices and rooms associated to eachentity.
The project also includes the construction of an underground parking of 110 places.
Technical characteristics
Laboratory equipments are very sensitive to the external vibrations for the activities centered on the physics and the renewal of very low-speed air to avoid the disturbance of the searches in fluids and transfer of energy.
Environmental characteristics
Certification NF HQE, Effinergie +, RT 2012.
The flows of hygienic ventilation organized in the implementation of hybrid ceilings in the completeness of the building allows to insure an optimal hygrothermal comfort the users.